What is BIM?s Level of Developments (LOD)?

· 2 min read
What is BIM?s Level of Developments (LOD)?

The Degree of Development (LOD) framework is really a system found in Building Information Modeling (BIM) to define the level of detail and accuracy of information contained within a BIM model at different stages of a project. The LOD framework offers a common language and understanding among project stakeholders regarding the level of information and model reliability.

There are different LOD specifications available, however the mostly used framework may be the LOD Specification produced by the American Institute of Architects (AIA), the Construction Specifications Institute (CSI), and the National Institute of creating Sciences (NIBS). The AIA LOD Specification defines six levels of development:

LOD 100: Conceptual Design
At this level, the BIM model represents basic massing, volumes, and conceptual design intent. It is used to convey the overall design concept without specific details or accurate dimensions.

LOD 200: Schematic Design
In this stage, the BIM model provides more descriptive information, including approximate sizes, shapes, and locations of creating elements. It serves as a tool for design development and additional analysis.


LOD 300: Design Development
At LOD 300, the BIM model becomes more refined and detailed.  Building Information Modelling Kenilworth  includes specific sizes, shapes, and orientations of creating elements. It incorporates information about systems, assemblies, and connections to aid design development and coordination.

LOD 350: Construction Documentation
At this level, the BIM model includes accurate and detailed information necessary for construction documentation and coordination. It incorporates specific products, quantities, and assemblies necessary for construction.

LOD 400: Construction Stage
LOD 400 represents the BIM model with as-built information through the construction phase. It offers actual product and material details, precise dimensions, and specific installation methods. It serves as a reference for construction teams.

LOD 500: As-Built Stage
At this final level, the BIM model reflects the actual conditions of the built project. It includes accurate and verified as-built information, such as installed equipment, systems, and components.

It's important to remember that the LOD definitions may vary slightly based on the project or organization. The LOD framework helps project stakeholders align their expectations regarding the degree of information and detail in a BIM model at different stages of a project. This facilitates effective collaboration, decision-making, and coordination through the entire project lifecycle.